clear gif clear gif clear gif clear gif
image image image
 
 

Clear DotHome

Clear DotAbout Us
Clear DotActivated Carbon
Clear DotSystems & Services
Clear DotNews & Events
Clear DotContact Us
Clear DotCareer Opportunities
Clear DotSearch<
image

Carbon Banner

Build Your Norit Activated Carbon Injection System

 

1) What is your flue gas flow rate (acfm)?
   Gas flow rate must be between 50,000 and 3,000,000

2) What do you expect your maximum Injection rate to be (pounds PAC/mmacf)?
   Injection rate must be between 0.5 and 20

3)
How many days of storage do you require for supply chain requirements?
   Days of storage must be between 5 and 60
 

4) Do you require volumetric or gravimetric feed?
Volumetric
Gravimetric

5) How many feed trains are required? [FT]
1
2
3


6) Will you require a control building with an MCC?
No
MCC only
Control building and MCC

7) Will the system be controlled by a local PLC or an existing plant DCS?

PLC
DCS
DCS with local control at the silo

8) For silo access do you require a ladder, stairs or neither?
Ladder
Stairs
Neither

9) Will you require a 1000# jib crane for lifting materials to the top of the silo?
Yes
No

10) Is a 10% roof slope acceptable or would you require level roof grating?
Standard 10% Slope
Level roof grating

11) Do you have dry instrument air for operating the fluidizing air and bin vent (20 CFM @90 psi)?
Yes, its available
No, I need an air dryer
No, I need an compressor and air dryer.

12) How would you like your silo delivered?
Supply only
Onsite installation
Pre-assembly

13) Will you need an ACI Distribution System for your duct work?
Yes
No

14) Describe your anticipated field support requirements (check all that you require)
Construction support
Commissioning support
Performance assurance
Operations training

15) Do you want a Norit systems engineer to contact you?
Yes
No

Name
Title
Company  
Email
Phone

 

 

 

 

 

 

 



 

 

Layout 10
image image image image image image